A straight-in landing is an approach in which an aircraft lines up with the runway centerline on final approach without flying a full traffic circuit (i.e., no downwind or base leg). This procedure may be conducted under VFR or IFR, often to expedite arrivals or when the aircraft is already established on final.
Hava trafik kontrolü (ATC) ile iletişim kurmayı öğrenmenin en hızlı ve en verimli yolunu sunuyoruz.
nocookies@learn-atc.com